Archive

Connecting to PN3B Axial Volcano

On August 8, 2014 all Secondary Infratructure at the summit of Axial Seamount was connected to Primary Node PN3B. Here, cable RS03W9 is being plugged into the SP1 port on PN3B. Photo Credit: NSF-OOI/UW/CSSF, Dive 1741; V14.

Read More »