Archive

Dive R1737 Highlights Axial Base

Axial Base PN3A: During Dive R1737m the1852 m-long extension cable  AXVMW4 that connects the Deep Profiler vertical mooring to the junction box LV03A was installed and connected to LV03A. This infrastructure is now connected to Primary Node PN3A. Video credit: NSF-OOI/UW/CSSF; Dive R1737; V14.  

Read More »