Archive

Dive R1778 Highlights Oregon Offshore Mooring

ROPOS reinstalled the LV01C junction box and the 120 m oily cable extending to the base of the Shallow Profiler Mooring. All cables were reconnected and the system was powered up. The Shallow Profiler powered up and communications were established.Video credit: NSF-OOI/UW/CSSF; Dive R1778; V14.  

Read More »