International District 2 Infrastructure

All Secondary Infrastructure is now installed and connected to junction box MJ03D – it awaits connection to Primary Node PN3B.  a) The bottom pressure-tilt instrument (BOTPA303) is slung beneath the ROV ROPOS for transport to the seafloor. b) Final installation image of the short-period OBSSPA305 connected to MJ03D. c) The current meter (VEL3DB304) being placed into its final location by the ROV ROPOS. d) Final placement of the bottom pressure-tilt instrument (BOTPTA303) installed and connected. Image Credit. Debbie Kelley, University of Washington, V14.