Archive

ROPOS Dive 1459 Highlights

The primary goal of ROPOS dive 1459 was to conduct tests on a trial OOI primary node. The primary node is made up of two major components: the backbone interface assembly (BIA) and the science interface assembly (SIA). This dive was used to test the interface between the ROV, BIA and SIA. 

Read More »