Archive

Testing Primary Node 3B

Spare commissioning support hardware is plugged into Primary Node 3B while it is fully powered up from >350 miles away at Pacific City, Oregon. A tool basket on the left holds the hardware, as well as other equipment that may have been needed for testing. The manipulator arms of ROPOS are in the foreground, waiting for the test to be completed.

Photo: OOI/UW/CSSF

Read More »