Dive Highlights J1044 Slope Base During Jason Dive J2-1044, the Platform Interface Assembly at Slope Base was installed and the Shallow Profiler Mooring was recovered. Credit: UW/OOI-NSF/WHOI; V18. Read More » November 15, 2018