Archive

Dive R1744 Highlights Oregon Offshore

Oregon Offshore: During Dive R1744, the low-voltage node, LV01C was installed and the extension cable RS01W9, running from Primary Node PN1C was conencted to the node. A survey of cable RS01W9 was initiated but not completed because permission was not yet give to plug into PN1C. Video credit: NSF-OOI/UW/CSSF; Dive R1744; V14.  

Read More »