Archive

PN1C doors open

Primary node PN1C at Endurance Offshore was deployed in a trawl-resistant frame, including doors over the connection points. ROPOS cut through the straps and opened the doors in preparation for laying cable RS01W9 from PN1C to LV01C.

Photo Credit: NSF-OOI/UW/CSSF, Dive R1743, V14

Read More »