Archive

R1730 Highlights ASHES Vent Field

ASHES Vent Field: Swapped out MJ03B and moved it just a meter or so for better stability. Installed 3-D thermistor array and Osmo sampler. Photomosaicked Mushroom installation and recovered the 3D test thermistor array (batter powered) from last year, as well as MJ03B. Video Credit: NSF-OOI/UW/CSSF; Dive R1730; V14 (02:56)

Read More »