Leg 3 of VISIONS ’13 is rapidly drawing to a close as we near the mouth of Yaquina Bay and the OSU dock at Newport, Oregon. The cruis
As part of the UW Sea-Going Research & Discovery course, students are required to conduct a project during their cruise leg.
Several student participants are included on each of four legs of the VISIONS ’13 expedition.
The R/V Thompson cast off from the UW dock at just past 9 am today, setting sail on the VISIONS ’13 expedition.
The VISIONS’13 expedition in July and August 2013 focused on deploying and testing 22,000 meters of extension cables
The VISIONS’13 expedition took place during July and August 2013, and successfully installed and tested some 22,000 meters of extension cables and four instrument subnets. All were left ready to be connected to the primary infrastructure.
Welcome to the VISIONS ’13 Log. Follow our six-week, four-leg expedition on the R/V Thompson. The focus of this cruise is on