Cabled infrastructure at the Oregon Endurance Shelf site, in 80 m of water, obtains power and communications from Primary Node PN1D located ~ 17 km to the west. The site is impacted by strong currents with very turbid water due to high productivity. Credit. D. Kelley and CEV, University of Washington.