Loading the player...
During Jason dive J2-922, the LV01C junction box, which was knocked on its side last year, was surveyed and sediment was removed to evaluate the connectors. Credit: UW/NSF-OOI/WHOI; V16.
During Jason dive J2-922, the LV01C junction box, which was knocked on its side last year, was surveyed and sediment was removed to evaluate the connectors. Credit: UW/NSF-OOI/WHOI; V16.