On August 8, 2014 all Secondary Infratructure at the summit of Axial Seamount was connected to Primary Node PN3B. Here, cable RS03W9 is being plugged into the SP1 port on PN3B. Photo Credit: NSF-OOI/UW/CSSF, Dive 1741; V14.